Quick Search:
OK
Detailed Search
Categories:
SPECIAL OFFERS
Blockage Removal
Camera Systems
Couplings
Drain Rods
Flood Prevention
Jetting Machines
Jetting Nozzles
Lateral Cutting Equipment
Leak Detection
Manhole Lifters & Keys
Pipe Location Equipment
Pipe Repair Systems
Pipe Stoppers and Testing
Safety Equipment & PPE
Torches
Van Fit Out's
Water & Drainage Exhibition 2010
Water Pumps
Manufacturers:
Contact Details (All)
UKPipelines.com
UKPTools.com
Water and Drainage Exhibition
National Sewerage Association
Water Industry Forum
Bailey Peerless
Electric Eel
Peugeot
KMR Pipeline Services
Home > Flood Prevention > Flood Barriers >
Flood Barrier For Houses & Lakes - Extension 2 - (Quick Find Code:FBE2)
Online Price:£ 43.92 inc VAT
(£ 37.38 ex VAT)

Manufacturers:

Visit the UKPipelines.com Web site
Order Qty:
Add to Basket
Continue Shopping

Details Image Gallery Multimedia Related Products
· Priced Per Metre

Additional tubing system consisting of 5 tubes, each 300mm diameter for a higher elevation of the Basic Flood Barrier System

Specifications: -

Patented device for Flood Protection (as a sand bag substitute), made of watertight, robust and tear-proof rubberised fabric tube.

The tube system consists of a minimum eight evenly formed chambers, welded, i.e. joined lengthwise with a diameter of circa 200mm each, with a minimum width of 2m and an overall length of up to 50m in one piece.

The single chambers are filled with water through automatical overpressure, thus the hollow parts will be stabilised and smoothly adjusted to ground bumps (See above illustration).

The tube chambers can be piled up according to the water level till the needed height is reached (depending on the water level). Additionally several tube systems can be piled up in layers in order to raise the Dyke or Lake top.

A Waste Water Pump can also be used to fill the tube system, which can be done quickly by just one or two people.

The Barrier can also be removed very easily, just by opening the tube’s seal and letting the water drain off.

Afterwards the tube can be coiled up around a tube drum (Optional) or stored in appropriate transport boxes.

Instructions

• Step One -
The Multi-chambered tubular film is placed in too position.
Step Two - The first chambers are filled with water until maximum capacity.
Step Three - The next chambers will be piled up in the shape of a pyramid and filled with water until maximum capacity.
Step Four - Finally the last chamber will be placed on top and filled with water.
Step Five - If the water level is still rising, additional tube systems can be added and filled with water.

PLEASE CONTACT US ON +44 (0)114 2564600 FOR MORE INFORMATION OR A PRODUCT DVD

Approximate Total Weight: 5 Kg 


Summary
Current order value:
£ 0.00
Currency:


Quick Find List
Your last 10 searches:
1. 120v Electric Jetter (1000 PSI, 2 GPM)
2. JetCam - Jet & Camera At The Same Time!!!
3. Floodgate- Medium (955-1175 Width x 680mm Hieght)
4. 8mm x 2m Steel Rod
5. Model D5 - 3 - 10 Inch Diameter Pipelines
6. Professional Lockfast Drain Rod Set (3 Tools)
7. 7/8" Dia x 3' Universal Rod (Single)
8. LF2TS-SO
9. Pearpoint Ex Proof Mainline Inspection System
10. 1" Kanaflex Suction Hose (Per Metre)